Shut In Procedure Well Control Quiz
Quiz-summary
0 of 20 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
Information
Properly and immediately shut the well in is very important to control the well; therefore, this quiz mainly focuses on shut in procedure. Doing this quiz is very good way to recall your well control knowledge. In this quiz, there are a total of 20 questions with multiple choice answers. You need to select one correct answer for each question and at the end of the quiz you will know the total score. For additional study, you may need to read some articles in drillingformulas.com or some well control book.

You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 20 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- Answered
- Review
-
Question 1 of 20
1. Question
Which statement is correct from the following list about Influx?
Correct
Incorrect
-
Question 2 of 20
2. Question
In which situations given below, the well shall be shut in immediately?
Correct
Incorrect
-
Question 3 of 20
3. Question
What are three important shut-in procedures while DRILLING from the following list?
Correct
Incorrect
-
Question 4 of 20
4. Question
Who is the person who has the responsibility to shut-in the well?
Correct
Incorrect
-
Question 5 of 20
5. Question
During a normal drilling operation, the BOP stack and choke manifold is lined like this.
HCR valves for operating BOP stack inner/outer choke and kill valves are in the CLOSED position.
Manual choke and kill valves on choke line side at the BOP (outboard of the HCR) are in the OPEN position.
Valves on the choke manifold are not in the normal flow routing in the CLOSED position.
Valves on the choke manifold are in the normal flow routing are in the OPEN position.
Remote Choke is CLOSED.
Mud Gas Separator Valve OPEN.
MGS Overboard Valve is CLOSED.
What is the line-up method?
Correct
Incorrect
-
Question 6 of 20
6. Question
After the well has been shut in, there are several items need to read and recorded. These include EXCEPT?
Correct
Incorrect
-
Question 7 of 20
7. Question
Which type of shut-in procedure will minimize the wellbore influx?
Correct
Incorrect
-
Question 8 of 20
8. Question
The vast majority of kicks happen unintentionally. As per the statistics, when do the majority of the kicks occur?
Correct
Incorrect
-
Question 9 of 20
9. Question
Which is the correct shut-in procedure while tripping from the following list?
Correct
Incorrect
-
Question 10 of 20
10. Question
What type of shut in will minimize water hammer effect?
Correct
Incorrect
-
Question 11 of 20
11. Question
After the well is securely shut in, the drilling personnel need to gather as much information about the wellbore condition as possible from the following EXCEPT:
Correct
Incorrect
-
Question 12 of 20
12. Question
Why do we use Shut In Drill Pipe Pressure (SIDP) to determine kill weight mud?
Correct
Incorrect
-
Question 13 of 20
13. Question
Typically, when the well is shut in, SIDP is usually less than SICP. However, there is a situation when both pressures are the same.
What could it be?
Correct
Incorrect
-
Question 14 of 20
14. Question
After bumping the float, the SIDP is 400 psi.
Well is shut in at 8900’ MD/ 8,000’ TVD.
Current mud weight is 12.0 ppg
What is the Kill Weight Mud required for this case?
Correct
Kill Weight Mud = 12.0 + (400 ÷ (0.052 x 8,000)) = 13.0 ppg
Incorrect
Kill Weight Mud = 12.0 + (400 ÷ (0.052 x 8,000)) = 13.0 ppg
-
Question 15 of 20
15. Question
The well is shut in with kick off bottom. There are few recommended options that can be performed to control the well EXCEPT.
Correct
Incorrect
-
Question 16 of 20
16. Question
In which situation, the float bumping procedure can be difficult to do?
Correct
Incorrect
-
Question 17 of 20
17. Question
What is the correct statement from the following about SICP and SIDP?
Correct
Incorrect
-
Question 18 of 20
18. Question
What is the shut in procedure which most drilling contractors and operators recommend?
Correct
Incorrect
-
Question 19 of 20
19. Question
In some occasion when large shut-in casing pressures cause an increase in the wellbore pressures above the influx. This can lead to differential sticking. What should you do during shut-in and well kill operation?
Correct
Incorrect
-
Question 20 of 20
20. Question
Vulnerable rubber parts (as bonnet seals, top seal, and ram packers) can fail under severe well conditions. What are those possible conditions?
Correct
Incorrect
Leaderboard: Shut In Procedure Well Control Quiz
| Pos. | Name | Entered on | Points | Result |
|---|---|---|---|---|
| Table is loading | ||||
| No data available | ||||
Not bad considering I’m a derrick hand with no formal well control training
bop
Good for practice
this was my first well control test. I think I can
I thank you for this educative quiz and God bless.
Wonderful stuff it’s a of good time with the questions. I’m happy that I can take care of the questions and also learn those new ideals.thanks
Good test keeps mind sharp cheers Officer Randall