Workover and completion are areas where well control can occur and personnel must understand well control correctly. In workover and completion, well control concepts are the same as drilling part and this quiz contains a total of 24 questions which are based on both IWCF and IADC well control. Additionally, learners can go to the list and select another question and each question will have the full explanations. In order to maximize your understanding, you need to carefully think through before selecting answer and you may need to use a calculator to figure out the answer in some questions.

Let’s get started.


Leaderboard: Workover and Completion Well Control Quiz

maximum of 24 points
Pos. Name Entered on Points Result
Table is loading
No data available

well control in one page
Share the joy
  • 233
  •  
  •  
  •  
  •  
  •  
  •  
  •  
    233
    Shares
Tagged , , . Bookmark the permalink.

6 Responses to Workover and Completion Well Control Quiz

  1. barchi says:

    q 18 there is a mistake in partial loss 15bbl/hr not 15 bbl/min . thanks

  2. Mario says:

    Hi Mr.shyne could u possibly have well controls quiz on coil tubing and snubbing aswell ?

    • Well Control Quiz Team says:

      Mario,

      Thanks for your comment. We will add some quizzes about coiled tubing and snubbing later.

      Regards,
      Shyne.

  3. Very good examples in how does it these steps.

    Thanks a lot.

  4. Good steps to start learning up about this WO & completion Wells in how its working.